Now running pilots with city planning departments
3.003.30
Permit review for city halls

Every permit,
checked before review.

Phill reads the drawings, checks them against your zoning rules, and shows your reviewer where each problem is.

Scroll to discover

Never measure by hand again

Phill reads the drawings.

Phill counts every floor.

Phill measures every setback.

Phill cites every clause.

Phill drafts the letter.

Your reviewers decide.

Try a sample case
Why it matters

One permit took three and a half years. Much of it was checking measurements.

84
260
100
25
132
First review
Applicant fixes
Re-check
Final check
Draft permit

Working days · permit 22-0754, Tel Aviv-Yafo · highlighted: the checks Phill does in minutes

301
days at the city, against a 240-day target
84
days to the first review, mostly measuring by hand
100
days to re-check the corrections
How it works

Four steps, one checked file.

Step 01

Upload the drawings

Open the architect's CAD file in the browser. Every sheet, label and dimension becomes searchable.

Step 02

Load your rules

We turn your zoning plan into a checklist once. Your planners review it and sign it off.

Step 03

Check every rule

Phill measures what each rule needs and marks it Pass, Fail, At limit or Needs reviewer.

Step 04

Send the letter

Your reviewer confirms each finding and sends a comments letter with only the open items.

Try it

Review a sample case.

Click a rule to see where it was measured. Accept or override it, then open the letter. Switch to try a different city's rules.

Case 19-0681 · Weizmann St. 119
Plan TA/3729A (Rova 4)
1 Fail1 Not found1 Needs reviewer3 At limit4 Pass0/10 decided
Floors & heights
Roof floor
Building lines
Balconies
Coverage & open space
B1B2B3GROUNDFLOOR 1FLOOR 2FLOOR 3FLOOR 4FLOOR 5FLOOR 6FLOOR 7ROOF FLOORAC±0.00+3.30+6.60+9.90+13.20+16.50+19.80+23.10+26.40+30.903.304.503.008 FLSECTION 1-1top +30.90WEIZMANN ST.PERMEABLE 15%ABFRONT BUILDING LINE3.005.204.001.751NSITE PLANPERMIT REQUEST 19-0681Weizmann 119 · Block 6212 / Parcel 11952 buildings · 64 units · 3 basementsScale 1:100 · units: m
Site plan · Building A balconies
R9 · § 4.1.2(f)(1–6)
Balcony projection beyond building line
Fail
Allowed
≤ 1.60 m
Measured
1.75 m
How: Balcony outline vs. front building line
88% confidence
Plan TA/3729A · p. 16

“Open balconies may project up to 1.60 m beyond the front building line. Balcony area up to 14 m² per unit, and an average of no more than 12 m² per building.”

The reviewer decides. Phill only prepares the file.

Modelled on a real Tel Aviv submission (2 buildings, 64 units). Clause text is the plan's own; a few measured values are adjusted to show every verdict.

Start a pilot in your city.

We set up your rules, your reviewers check real cases for a few weeks, and you see how much time it saves.

Nothing to install · Your rules, your language · Reviewers stay in charge